Projects
SBE learned all the tricks of the trade in Benelux, before travelling all over the world. Today, we have references in more than 35 countries. Our well-oiled team of more than 140 engineers and BIM engineers successfully accomplish more than 150 projects every year. These projects are spread across SBE’s five core activities. A small selection from our portfolio can be found below.
Discipline
- Civil engineering & infrastructure
- Electromechanics
- Industry & Buildings
- Port, river & hydraulic engineering
- Urbanism & Design

Bicycle bridge Wielsbeke Waregem
Started: 2020 / Status: Study in progress

Converting R4 West and East
Started: 2014 / Status: Study in progress

Meulestede Bridge
Started: 2011 / Status: study completed

All Weather Terminal
Started: 2016 / Status: Completed

Renovation Pierre Vandamme Lock
Started: 2010 / Status: Study and work in progress

Construction 3rd chamber Princess Beatrix lock
Started: 2016 / Status: Completed

Malamocco Lock
Started: 2016 / Status: Study completed, work in progress

Farakka lock
Started: 2017 / Status: Completed

Renovation of Royers lock
Started: / Status: Study and works in progress

Scaldis lock
Started: 2010 / Status: Completed

Refurbishment of intersection N49
Started: / Status: Study in progress

Road bridges Albert Canal
Started: 2008 / Status: /

Conversion Durme Valley, part of the SIGMA Plan
Started: 2010 / Status: Study and work in progress

Port of Rotterdam
Started: 2015 / Status: In progress

Refurbishment Seine Scheldt
Started: 2011 / Status: /

Pedestrian and cyclist bridge Wetteren
Started: 2012 / Status: Finished

Kieldrecht lock road bridges
Started: 2019 / Status: Completed

Renovation Mexico bridges
Started: 2014 / Status: Completed

TivoliVredenburg
Started: ... / Status: Study & works completed

Timmerhuis
Started: ... / Status: Study & works completed

Multi-purpose SNCB workshop
Started: 2014 / Status: Study & works completed

Rotterdam Central
Started: ... / Status: Study & works completed

Cycle bridge Vijfstraten
Started: 2017 / Status: Study phase

Zenne bridge
Started: 2015 / Status: Study realised, work in progress

Deinze Bicycle Bridge
Started: 2017 / Status: Study in progress

NATO tunnel
Started: 2005 / Status: Study & works completed