NL / FR / EN

The Zenne bridge is officially open

Last week, on the 26th of August, the new Zenne bridge in Halle was opened. The bridge connects to the new Zuid bridge of De Vlaamse Waterweg. Because of this we will have to wait until the beginning of 2023 to be able to drive the entire route.

#teamsbe completed the full package, from a preliminary design to the follow-up of the constructions and 3D visualizations. It’s always a rush to see one of our designs being finalised.

Read more about the project.

Van 3D visualisatie
tot realiteit

Share: >>

Recent posts

Return to overview